close

此文章來自奇摩知識+如有不便請留言告知



標題:

[logistic物流] order cycle time 同 lead time 有咩吾同 (difference)?

發問:

[logistic物流] order cycle time 同 lead time 有咩吾同 (difference)?

最佳解答:

Lead time means time required to get everything together before production begins. Order cycle is lead time + production time. Hope this makes sense. Good luck.

其他解答:

oh... u 2 have totally different answer = ="|||||Cycle time : A factory that make dim sum for resturant, the dim sum has a production process, from the start of production to the ready of the food, how long time to complete it ? The no. of days is the cycle time. So, you may consider its the time of the process from beginning to end of doing something. Lead time : A customer order for the product --> Factory get order entry into system --> prepare material to build the product (usually need to purchase something) --> production/manufacturering --> testing--> packing --> shiping --> customer. How long time it take ? the no of days is the lead time ! (the days your customer need to wait ). Some company keep stock, the lead time is shorter. In a resturant, customer order a set lunch, he wait 10 minutes to get the set to eat. The lead time is 10 minutes law. If you are concern, Cycle time --> processing time Lead time --> customer waiting time Are they the same ? sometimes they are the same depends on your industry, your stock, and what part of the process you want to measure for cycle time.CAAD3F79AE16AF09

arrow
arrow
    文章標籤
    物流 文章 奇摩
    全站熱搜
    創作者介紹
    創作者 gabrieh6vn0 的頭像
    gabrieh6vn0

    快遞百科

    gabrieh6vn0 發表在 痞客邦 留言(0) 人氣()